2026-03-15
Prefabricated WWTP uses modular design—factory-built and site-assembled like building blocks. Versus traditional construction, OPEX drops >40%, land use 30-60% less, build time 30-60 days.
Mature processes A²/O, A²/O-MBBR, A/O-MBR deliver effluent meeting surface-water class III/IV or class-1A.